-
•
Mumbai-Ahmedabad Bullet Train Achieves 4.88 Km Tunnel Breakthrough Between Shilphata-Ghansoli; Set To Open In 2027
swarajyamag.com Learn moreUnion Railway Minister Ashwini Vaishnaw on Saturday (20 September) conducted the breakthrough of a 4.88 km-long tunnel between Shilphata and Ghansoli for the Mumbai-Ahmedabad bullet train project.0
© 2025 Indiareply.com. All rights reserved.