-
•
Mumbai Metro Line 4 Achieves 84.5 Per Cent Completion As MMRDA Installs 58 M Steel Span Over Pantnagar-Ghatkopar Bus Station Area
swarajyamag.com Learn moreThe Mumbai Metropolitan Region Development Authority (MMRDA) has marked a major achievement in the construction of Mumbai’s Metro Line 4 (Wadala–Kasarvadavli) by installing a 58-metre-long steel span over the Pantnagar–Ghatkopar Bus Station in Ghatkopar East.0
© 2025 Indiareply.com. All rights reserved.