-
•
New 1.3 Km Underground Tunnel Proposed To Connect Metro Line 3 And Bullet Train Terminus In Mumbai's Bandra Kurla Complex: Report
swarajyamag.com Learn moreThe move aims to streamline commuter transfers and provide seamless last-mile connectivity.The tunnel will likely be built 12 meters below ground using the push box method and will pass beneath the Vakola Nallah.0
© 2025 Indiareply.com. All rights reserved.