Community Information
-
•
Perungalathur bridge work is creating lot of traffic during peak hours
I went to pickup my relative from Tambaram railway station today morning around 7. While returning to vandalur, it took me more than 30 minutes to cross the Perungalathur railway bridge. There were metal ramps placed temporarily that the vehicles from both sides(city and highway) has to cross causing a lot of traffic. Hope they finish that bridge work soon.3
© 2025 Indiareply.com. All rights reserved.